• Sherwood Heights Private School

    Author: Retention - Pegah Construction Ltd. |

    Project Name: Sherwood Heights Private School Type: Private School Owner: Private Contract Type: CCDC 2 Gross Floor: 30000 sq. ft. Location: Mississauga Date Completed: 2006 Architect: A.Fazel Architect Value: ------- Description:  Private school 2 floors including a sports Gym  

    CLICK HERE TO READ THE FULL ARTICLE »


  • Robarts Library 4th Floor Renovations - University of Toronto

    Author: Omid Mortezaei |

    CLICK HERE TO READ THE FULL ARTICLE »


  • 1210 - Matty Eckler Community Centre Facility Renovations

    Author: Retention - Pegah Construction Ltd. |

    Project Name: Matty Eckler Community Centre Type: Facility Renovations Owner: City of Toronto Contract Type: Prime Contractor Gross Floor: ------- Location: 953 Gerrard Street East, Toronto, ON Date Completed: October 2012 Architect: AECOM Value: $1.7 Million Description: Interior renovations to allow for the installation of a new elevator. Replacement of interior ceiling finishes in the pool area. Replacement of exterior storefront glazing at ground level at the building entrance. Installation of the new vestibule. Upgrades to the existing HVAC system. Misc. electrical work related to power for mechanical equipment. Replacement of pool lighting systems.

    CLICK HERE TO READ THE FULL ARTICLE »


  • 1311 - Canadian Martyrs Elementary School

    Author: Retention - Pegah Construction Ltd. |

    Location: 1185 Mississauga Valley Blvd., Mississauga, ON Date Completed: November 2013 Architect: Hossack & Associates Architects Value: $1.2 Million Description: Two classroom additions at 2,800 sq. ft. and interior renovation for two additional classrooms at 2,500 sq. ft. Both areas of work were done simultaneously. Work included four new washrooms, new walls, windows, and new finishes. Exterior work included 17,500 sq. ft. of new asphalt, 160 feet of new retaining wall, and landscaping. Extra work for the relocation of water main, sodding, and grading, gas meter enclosures were done upon Clients request.

    CLICK HERE TO READ THE FULL ARTICLE »


  • 1409 - St. Edmund Secondary School

    Author: Retention - Pegah Construction Ltd. |

    × Project Name: St. Edmund Secondary School Type: Alterations Owner: Dufferin Peel Catholic District School Board Contract Type: Prime Contractor Gross Floor: ------- Location: 1250 Melton Drive, Mississauga, ON Date Completed: September 2014 Architect: Salterpilon Architecture Value: $1.1 Million Description: Interior alteration of two classrooms. It was completed in three months. Interior non-load-bearing masonry. Modification of electrical service and add light fixtures in the ceiling, change all curtain walls on both sides of the school, exchange of the radiator system, adding 2 sprinkler system extra. All associated electrical, mechanical, and site work. Restoring around the construction area. Interior Finishes – Flooring, drop ceilings, drywall, painted block wall partitions, chain link fence.

    CLICK HERE TO READ THE FULL ARTICLE »


  • 1508 - Iona Catholic Secondary School

    Author: Retention - Pegah Construction Ltd. |

    × Project Name: Iona Catholic Secondary School Type: Cap Renewal Owner: Dufferin Peel Catholic District School Board Contract Type: Prime Contractor Gross Floor: ------- Location: 2170 S Sheridan Way, Mississauga, ON Date Completed: August 2015 Architect: Stafford Haensli Architects Value: $1 Million Description: Interior renovations to two classrooms consisting of stage hardwood flooring and stairs replacement, building masonry concrete block walls with concrete platform area, curtain track modifications, new ductwork, and plumbing. Two existing air make-up units were replaced along with associated duct and louver work. Related interior finishes included flooring, millwork, drywall, LAP ceiling, and painting. Interior electrical, mechanical, and control upgrades to the two-story school building included replacement of building automation system, emergency lighting, exit lights, and terminal…

    CLICK HERE TO READ THE FULL ARTICLE »


  • 1508 - St. Agnes Elementary School

    Author: Retention - Pegah Construction Ltd. |

    × Project Name: St. Agnes Elementary School Type: Cap Renewal Owner: Dufferin Peel Catholic District School Board Contract Type: Prime Contractor Gross Floor: ------- Location: 103 Richvale Dr S, Brampton, ON Date Completed: August 2015 Architect: Stafford Haensli Architects Value: $600,000 Description: Interior renovations to the two-story school building consisting of replacing carpet throughout school, and some flooring and wall tile replacement. Replacement of all interior lighting, all plumbing fixtures, all roof-mounted exhaust fans, and terminal heating and package units. Patching and restoring where required.

    CLICK HERE TO READ THE FULL ARTICLE »