• 1312 - Pre-Engineered Storage Building

    Author: Retention - Pegah Construction Ltd. |

    Location: 7 Leslie Street and 1401 Castlefield Road, Toronto, ON Date Completed: December 2013 Architect: Eugene Kuan Architect Interiors: ------- Value: $1.1 Million Description: Demolished and removed existing steel storage buildings, foundations at both locations. Supply and install pre-engineered steel storage building from VP Buildings at both locations complete with new foundations, slabs on grade. Pegah also assisted the Consultant by applying for a permit for demolition and new building.

    CLICK HERE TO READ THE FULL ARTICLE »


  • 1407 - Highland Creek Treatment Plant

    Author: Retention - Pegah Construction Ltd. |

    × ❮ ❯ Project Name: Highland Creek Treatment Plant Type: New Construction and Rehabilitation of North Workshop Owner: City of Toronto Contract Type: Prime Contractor Gross Floor: 219000 m3 Location: 51 Beechgrove Drive, Scarborough, ON Date Completed: Phase I January 2014 Phase II June 2014 Architect: Unit A Architecture Value: $4.9 Million Description: The City of Toronto Highland Creek Treatment Plant is a 15.250 hectares fenced campus composed of (50) buildings. The facility is operated 24 hours a day, 7 days a week. Pegah was contracted to perform a 2 phase project which included the construction of a 12,000 sq.ft New North Workshop facility in phase one and with the restoration of the Old Workshop under phase two after the successful relocation…

    CLICK HERE TO READ THE FULL ARTICLE »


  • 1710 - EMS Multifunction Station – 1300 Wilson Avenue

    Author: Retention - Pegah Construction Ltd. |

    × Project Name: EMS Multifunction Station Type: New Construction Owner: City of Toronto Contract Type: Prime Contractor Gross Floor: 29,500 sq. ft. Location: 1300 Wilson Avenue, Toronto, ON Date Completed: October 2017 Architect: Thomas Brown Architects Value: $10.6 Million Description: The Toronto first EMS Multifunction Station at 1300 Wilson Ave., west of Keele Street and Humber River Hospital, is designed to accommodate up to 25 ambulances, their respective paramedic crews, and support services of the North-West District Office of Toronto Paramedic Services. It is the largest ambulance station ever built in the City of Toronto. The New EMS Multi-Function Station is an approximately 22,000 sq. ft., 2 story building which facilitates offices, washrooms, showers, a kitchenette, a vehicle bay, classrooms…

    CLICK HERE TO READ THE FULL ARTICLE »


  • 1808 - Fewster Community Recycling Centre

    Author: Retention - Pegah Construction Ltd. |

    Project Name: Fewster Community Recycling Centre Type: Construction of a Leaf and Yard Transfer Station Owner: Region of Peel - Infrastructure and Development | Waste Management Contract Type: Prime Contractor Gross Floor: ------ Location: 1126 Fewster Drive, Mississauga, ON Date Completed: August 2018 Architect: WSP Value: $2.2 Million Description: Fewster Community Recycling Centre Project consists of the construction of the new Leaf and Yard Waste Transfer Station Bunker, 40 Ft. in-bound Scale, and 80 Ft. out-bound weigh scales, new traffic control devices, program software, and CCTV cameras. There was also the construction of the underground encased concrete duct banks for the conduits and heavy-duty truck asphalt laneway. The Truck access laneway was constructed within an existing Hydro easement area…

    CLICK HERE TO READ THE FULL ARTICLE »


  • 1908 - TTC Allen-Sheppard

    Author: Retention - Pegah Construction Ltd. |

    CLICK HERE TO READ THE FULL ARTICLE »


  • 1909 - TTC Leslie Barns

    Author: Retention - Pegah Construction Ltd. |

    × Project Name: TTC Leslie Barns Type: Ramp Modifications Owner: Toronto Transit Commission Contract Type: Prime Contractor Gross Floor: ------- Location: 1165 Lakeshore Blvd. East, Toronto, ON Date Completed: September 2019 Architect: ------- Value: $270,000 Description: Work includes Leslie Barns Loading Ramp Modification to correct the slope of the loading ramp. Demolish and remove existing concrete stairs, railing, and concrete column curbs. Disconnecting and protecting existing wiring during the work. Un-installing existing vehicle restraint devices and storing for reinstallation. Construct new stairs and railings, paint stairs railing, bollards, and column curbs. New concrete on the floor with the installation of trench drains and embedded pipping. During work, we have to maintain operations access to existing entrances and facilities.

    CLICK HERE TO READ THE FULL ARTICLE »


  • 1911 - Warehouse Renovation

    Author: Retention - Pegah Construction Ltd. |

    CLICK HERE TO READ THE FULL ARTICLE »


  • 220 Duncan Mills Road

    Author: Retention - Pegah Construction Ltd. |

    × Project Name: 220 Duncan Mills Road Type: Design Owner: Mohamad Abhari Contract Type: Prime Contractor Gross Floor: ------- Location: Toronto Date Completed: 2012 Architect: Petroff Value: ---- Description: ---

    CLICK HERE TO READ THE FULL ARTICLE »


  • Garden Square

    Author: Retention - Pegah Construction Ltd. |

    CLICK HERE TO READ THE FULL ARTICLE »